Moment Energy Launches 500 kWh Second-Life BESS Platform

Moment Energy logo
Moment Energy has started production of Nova, a 200 kW/500 kWh stationary storage block made from repurposed EV batteries. The UL-certified system is scheduled for first deliveries in the first quarter of 2027.

Share This Post

Moment Energy announced on November 17, 2026, the launch of Nova, a battery energy storage system built with repurposed electric vehicle batteries. The company said Nova is the first such BESS to receive both UL 1973 and UL 9540 certification, supporting deployment in commercial, industrial and large-scale storage applications. Production is underway at Moment Energy’s Megafactory 1 for projects across North America.

The platform can integrate battery packs from multiple EV types. Its proprietary AI-powered battery management system continuously evaluates and optimizes packs with different states of health to manage performance, efficiency and reliability over the system’s service life. Each block is rated at 200 kW and 500 kWh and occupies a 2.94 m by 1.80 m footprint. Moment Energy said the modular design can serve space-constrained commercial sites and scale to installations in the tens of MWh.

Nova is intended to support utility bill savings, grid services and backup power during outages. Its swappable architecture allows individual battery packs to be replaced as they age, while the enclosure and concrete pad remain in place. With the company’s capacity augmentation service, the system is designed for a lifespan of more than 20 years. Moment Energy also said it has already deployed storage systems at airports, hospitals, agricultural sites and manufacturing facilities.

The system is manufactured in North America and has been independently verified as compliant with Foreign Entity of Concern requirements. Moment Energy has also been verified as a non-Prohibited Foreign Entity. Based on those verifications, the company described Nova as the only third-party-verified BESS eligible for the U.S. federal Investment Tax Credit in 2027 and later.

UL Solutions certified Nova to UL 9540. The system has also achieved UL 1973 certification and undergone UL 9540A testing for thermal runaway fire propagation. Megafactory 1 is certified to UL 1974, which covers sorting, grading and repurposing EV batteries. Orders are open, with first deliveries planned for the first quarter of 2027.

Nova BESS launch · November 2026

Moment Energy Launches 500 kWh Second-Life BESS Platform

Nova combines repurposed EV batteries with UL 1973 and UL 9540 certification, supporting commercial, industrial and large-scale storage across North America.

500 kWhEnergy per Nova blockBuilt with repurposed electric vehicle batteries.
Footprint
First footprint dimension9.65 ft equivalent2.94 m
Second footprint dimension5.9 ft equivalent1.80 m
Block power200 kWPower delivered by each Nova block.
Installation scaletens of MWhsThe scalable design supports large-scale installations.
System lifespan20 yearsMore than, with Moment Energy’s capacity augmentation service.
First deliveryQ1 2027Deliveries planned; unveiled 10:30 AM PT, November 17, 2026.

Neutral rows show Nova’s footprint; Nova holds UL 1973 and UL 9540 certification and has UL 9540A testing, while Megafactory 1 holds UL 1974 certification.

Domestic advantageIndependent FEOC and non-Prohibited Foreign Entity verification makes Nova the only third-party verified BESS eligible for the U.S. federal ITC in 2027 and beyond.
Moment Energy Launches 500 kWh Second-Life BESS Platform · BatteryTech Network

Source: globenewswire.com

Subscribe to Newsletter

Share This Post

Logo_Battery-Tech-Network_Thumbnail

Subscribe To Our
Weekly Newsletter​

Logo_Battery-Tech-Network_Thumbnail

Contact Form