Study Finds Up to 10% Excess Power in Renewable Grid

MIT — Study Finds Up to 10% Excess Power in Renewable Grid
MIT and Georgia Tech researchers found that U.S. power systems supplying 80% of demand from renewables could generate up to 10% more electricity than grids can use or store, creating predictable windows for flexible industrial loads.

Share This Post

Researchers at the Massachusetts Institute of Technology (MIT) and Georgia Tech reported on November 26, 2026, that future U.S. electricity systems could produce substantial amounts of excess renewable power. The study modeled systems in which wind and solar generation supply 80 percent of the electricity delivered to customers, using different combinations of wind and solar capacity.

The researchers found that cost-effective systems meeting this renewable energy share could generate as much as 10 percent more electricity than the grid could immediately use or store. The result remained largely consistent across U.S. regions and in scenarios with low-cost energy storage, including storage priced an order of magnitude below current battery storage costs.

The model incorporated 40 years of U.S. weather data to capture extremes and fluctuations in wind and solar resources. It also considered regional demand profiles and the cost of building batteries and other energy storage technologies.

According to the study, excess generation would be most common in spring, with smaller surpluses occurring in mid- to late fall. Individual periods would typically last seven to 12 hours, generally from midday through the afternoon, and could sometimes continue for several days.

The predictable timing could allow flexible industrial processes to use electricity that would otherwise be curtailed. Potential applications include raw material grinding, electric arc furnaces for steel production, and manufacturing fertilizer or concrete. Flexible computing workloads, including AI model training, could also be scheduled around expected periods of surplus power, while data centers could use the resource to help meet growing electricity demand.

Intermittent operation can be more difficult than continuous production, but the researchers said equipment and processes could be designed around these recurring windows. Options include using less-capital-intensive machinery or sharing equipment among manufacturing sites. Future research will examine the cost of the infrastructure, equipment and technologies required to use excess renewable electricity.

Source: news.mit.edu

Subscribe to Newsletter

Share This Post

Logo_Battery-Tech-Network_Thumbnail

Subscribe To Our
Weekly Newsletter​

Logo_Battery-Tech-Network_Thumbnail

Contact Form